UW-6 Power Bulkhead Connector Assembly Wiring

CB-Series Buoys supplied with a CB-PTL Pass-Through Lid for integration of user-supplied electronics include a UW-6 power bulkhead connector (UW6-BULK) port on the lid. The UW6-BULK connects to the solar tower on the outside of the buoy and has bare wires with Molex connector on the inside of the data well. Information regarding the port […]

Read More

Increase Flash Intensity

The minimum and maximum flash brightness settings of a M550 beacon are dependent on the configured flash code. For the 066 flash code typically set on NexSens-supplied beacons, the maximum effective intensity that can be set is 20cd as demonstrated by Carmanah’s table below.  A complete listing of Flash Codes is available in Carmanah’s manual […]

Read More

How to Install a 4G Modem in a 3100-iSIC

Prior to installation, be sure that the new 4G cellular modem has a SIM card installed and its account is active. 1. Open up the 3100-iSIC enclosure and remove both fuses by pressing down on the holder cap and turning it counterclockwise.   2. Use a large Phillips screwdriver to remove the four primary mounting […]

Read More

G2-Rain Data Logger Maintenance

Periodic maintenance of a G2-RAIN Alert system includes the following items: Clearing debris out from inside the siphoning bucket receiver and drain holes Replacement of the internal lithium battery pack when the reported system voltage drops to 6.2V or below Note this does not apply for externally powered G2-RAIN systems using an AC wall adapter […]

Read More

Replace RF-Cable Assembly

In the event of damage, the RF cable assembly on the X2 data logger can be replaced. Caution!!!- Be sure to statically ground yourself prior to touching any of the electronics inside the X2 logger!   Tools Required: Phillips Head Screwdriver 3/16″ Hex Driver or Adjustable Wrench 5/8″ Socket Instructions Locate the green plastic wire […]

Read More