Replace an SP6 Battery

    Every couple years (2-3) an SP6 battery should be replaced in order to ensure reliable power delivery. Disconnect the UW-6 pigtail cable from the logger Remove the SP6 from its mounting location and place on a flat work surface Typically the easiest means of removing the SP6 is to remove both 1/4-20 x 1-1/2″ socket […]

    Read More

    G2-MET Troubleshooting

    Symptom Possible Cause Corrective Action Claim code does not work Code was entered incorrectly Re-enter code exactly as shown on the serial label Device was already claimed Check with previous owners/users WQData LIVE’s Last Contact time does not update   OR   Device does not upload new data to WQData LIVE No power to device […]

    Read More

    SP6 Solar Power Pack Maintenance

    The only required maintenance for the SP6 Solar Power Pack are the following items. Clean the solar panel surface if it becomes covered Even small obstructions can have a significant impact on power output Ensure the vent is clear to prevent pressure buildup Replace the solar pack’s rechargeable battery every 2-3 years

    Read More

    G2-MET Maintenance

    The only required maintenance for the G2-MET are the following items. Wipe down the Airmar weather station periodically with a damp cloth and clear any debris from the wind channel Perform typical SP6 Solar Power Pack Maintenance

    Read More

    Mounting the G2-MET or G2-HYDROMET

    When mounting a G2-MET or G2-HYDROMET there are a couple considerations that should be taking into account in order to ensure the most accurate measurements. Ensure the Airmar’s alignment notch is pointing north Choose a location where the device is not blocked by other objects Nearby obstructions can affect the wind measurements and result in […]

    Read More